Now it's time for some Whats, Whys and Hows. For those of you whose eyes glaze over when people start talking about wiring, electronics, and programming, you may skip this section and get your friend like me to come and do this.
Wednesday, November 4, 2015
Oyama Staging Yard II - Wiring
At the end of the last post, I left you with this picture.
Now it's time for some Whats, Whys and Hows. For those of you whose eyes glaze over when people start talking about wiring, electronics, and programming, you may skip this section and get your friend like me to come and do this.
Now it's time for some Whats, Whys and Hows. For those of you whose eyes glaze over when people start talking about wiring, electronics, and programming, you may skip this section and get your friend like me to come and do this.
Monday, November 2, 2015
Oyama Staging Yard I - Construction and Track Design
The west staging yard, which I'm calling Oyama, since it is in the place where Oyama Yard is on the S-Line, is now finished and installed in the train house. I've got a video on YouTube showing this yard and how it operates.
Thursday, November 27, 2014
Track Plan I - Levels 1 & 2
See my Givens and Druthers (Part I and Part II) for the space I have available and my goals with this layout design. I found out that there isn't room in a 9-1/2 foot wide space to have a peninsula with a blob on the end with an 18" radius. That leaves an around the room design. I've operated on other layouts that had duck-unders and movable bridges, and I'm not getting any younger, so I don't want any tracks across the door.
That leaves an around the room design going back and forth. To represent almost 50 miles of railroad I need to use multiple levels. I saw a clinic at the Hub City MER/NMRA convention about using narrow shelves for a layout and how this can avoid many of the problems associated with multi-deck layouts. This will require modification at two stations, Barber and Statesville, because the wyes at those locations are important to operations.
It looks like this will have four or five visible levels. The top level, which is above head height,is the west staging yard, representing Oyama Yard in Hickory, NC. I'm calling this Level 0.
That leaves an around the room design going back and forth. To represent almost 50 miles of railroad I need to use multiple levels. I saw a clinic at the Hub City MER/NMRA convention about using narrow shelves for a layout and how this can avoid many of the problems associated with multi-deck layouts. This will require modification at two stations, Barber and Statesville, because the wyes at those locations are important to operations.
It looks like this will have four or five visible levels. The top level, which is above head height,is the west staging yard, representing Oyama Yard in Hickory, NC. I'm calling this Level 0.
West Staging Yard
Monday, November 24, 2014
Modeled Area - Update
After starting construction, I decided that have a shelf devoted to only one train a day in each direction wasn't a good use of space. Also, I have a bunch of the Fox Valley Models Siverside coal gons on order. I dropped the portions of the C&NW branch to Gastonia, and filled in the missing section of the S-Line through Claremont and Catawba.
See the previous post for more details.
See the previous post for more details.
Tuesday, August 5, 2014
Sunday, February 16, 2014
Operations I - Sample Train Orders
I don't have any trains in the train house yet, but I'm already thinking about operations. I occasionally buy train order from E-bay. These are Southern Ry. orders in areas close to my layout, but I haven't found any issued on the S-line in North Carolina yet. A recent order included a set of related orders issued at Severe Yard in Knoxville, TN. These orders are all on the Knoxville to Harriman line of the Tennessee Division. I'll start off with a list of the stations on this line. Sevier to Harriman is Westbound.
Miles from Station Siding Other
Knoxville
0.0 West End Sevier Yard - yard
(East End Two Tracks)
3.8 Beverly Block
(West End Two Tracks)
2.3 Coster - yard
4.6 Black Oak - 56
8.2 Powell 104 10
13.4 Heiskell - 45
15.6 Chestnut Ridge - -
19.9 East Siding 116 160
20.9 Clinton - yard
24.6 Laurel 71 5
33.6 Poplar 55 7
35.6 Oliver Springs - 15
36.1 L. & N. Jct., Tenn. - -
41.5 Blair 115 50
46.0 De Armond 51 -
50.5 Harriman - 30
51.5 Harriman Jct. - 170
Layout Construction III - Backdrop & Valance
Subscribe to:
Posts (Atom)


