Friday, April 7, 2017

Construction Photos and Updated Plans

My contractor has been busy and the new wall are studded in, the old bathroom removed, the new half bath roughed in. I'm waiting for the electrical work to get started.

Here are some pictures.
New wall between the garage and the train room.


Door framed into the wall from the garage.

Looking through the door. This will be the dispatcher's office.

Standing in the dispatcher's office looking through the door at the washer/dryer.

Another view of the washer/dryer. Newton will be above these and extend along the wall on the right. The drain line from the upstairs couldn't be moved, so the layout will be behind it. 

Turning left, the layout along the right-hand wall will be twice through. Claremont will be in the far right corner on the bottom, and Conoveer will be on the top. It will separate into two shelves at that point. The central peninsula will be in the middle of this space. New half bath on the left.

Looking back into the garage from the other direction. The stairs going up to the house on the left. The center peninsula will snake through here.

This little cubbyhole will be the scene along the Catawba River, approaching Catawba on the lower level, and heading into Hickory on the top level. Note the rounded corners, the better to turn walls into backdrops.
Looking back toward the dispatcher's office in the distance. This space will have the staging yards on the left, on the wall where the stairs are. The peninsula will start here with very narrow benchwork down the center of this space.
Below I've added links to the layout plan. I decided to do these as pdf files rather than trying to embed graphics into the page.

Level 1.

Level 2.

No comments:

Post a Comment