Saturday, February 24, 2018

Measure Once, Cut Twice. Um ...Okay ... Repeat

At least I can make it smaller
I found a slight miscalculation in my wall measurements, but at least this part is too big rather than too small. This is the deck for the south part of Newton, which is the old Carolina & Northwestern line going to Lincolnton, Gastonia, and York, SC.

Friday, April 7, 2017

Construction Photos and Updated Plans

My contractor has been busy and the new wall are studded in, the old bathroom removed, the new half bath roughed in. I'm waiting for the electrical work to get started.

Here are some pictures.
New wall between the garage and the train room.


Saturday, November 26, 2016

Expanding my S-Line

My outbuilding in Laurinburg was a bit less that 150 square feet. The new trainroom is about 800 square feet. This will mean that I'll only have two levels instead of four or five. It also means that I can model more territory. Here is what I plan on modeling now.


Monday, October 3, 2016

Moving! (This is not a sad story.)

Into the life of every layout there comes a time to move, or be chopped up. This time has come to my Southern S-Line, which wasn't even very far along yet.

 

Here are the pieces of the layout I had in the train shed, carefully removed by the truck driver and ready to load. Fortunately, I have a new job, a new house, and a new knee (well not new, just repaired). I did learn a lot building this part of the layout. I doubt any of these pieces will be used again, but the Southern's S-Line is not dead. It is coming back better than it would have been before.

Friday, January 1, 2016

Wednesday, November 4, 2015

Oyama Staging Yard II - Wiring

At the end of the last post, I left you with this picture.


Now it's time for some Whats, Whys and Hows. For those of you whose eyes glaze over when people start talking about wiring, electronics, and programming, you may skip this section and get your friend like me to come and do this. 

Monday, November 2, 2015

Oyama Staging Yard I - Construction and Track Design

The west staging yard, which I'm calling Oyama, since it is in the place where Oyama Yard is on the S-Line, is now finished and installed in the train house. I've got a video on YouTube showing this yard and how it operates.


Thursday, November 27, 2014

Track Plan I - Levels 1 & 2

See my Givens and Druthers (Part I and Part II) for the space I have available and my goals with this layout design. I found out that there isn't room in a 9-1/2 foot wide space to have a peninsula with a blob on the end with an 18" radius. That leaves an around the room design. I've operated on other layouts that had duck-unders and movable bridges, and I'm not getting any younger, so I don't want any tracks across the door.

That leaves an around the room design going back and forth. To represent almost 50 miles of railroad I need to use multiple levels. I saw a clinic at the Hub City MER/NMRA convention about using narrow shelves for a layout and how this can avoid many of the problems associated with multi-deck layouts. This will require modification at two stations, Barber and Statesville, because the wyes at those locations are important to operations.

It looks like this will have four or five visible levels. The top level, which is above head height,is the west staging yard, representing Oyama Yard in Hickory, NC. I'm calling this Level 0.

West Staging Yard

Monday, November 24, 2014

Modeled Area - Update

After starting construction, I decided that have a shelf devoted to only one train a day in each direction wasn't a good use of space. Also, I have a bunch of the Fox Valley Models Siverside coal gons on order. I dropped the portions of the C&NW branch to Gastonia, and filled in the missing section of the S-Line through Claremont and Catawba.


See the previous post for more details.

Tuesday, August 5, 2014

Sunday, February 16, 2014

Operations I - Sample Train Orders

I don't have any trains in the train house yet, but I'm already thinking about operations. I occasionally buy train order from E-bay. These are Southern Ry. orders in areas close to my layout, but I haven't found any issued on the S-line in North Carolina yet. A recent order included a set of related orders issued at Severe Yard in Knoxville, TN. These orders are all on the Knoxville to Harriman line of the Tennessee Division. I'll start off with a list of the stations on this line. Sevier to Harriman is Westbound.
Miles from             Station                       Siding   Other
Knoxville
    0.0             West End Sevier Yard            -         yard
                     (East End Two Tracks)
    3.8                    Beverly Block
                     (West End Two Tracks)
    2.3                        Coster                          -          yard
    4.6                     Black Oak                      -            56
    8.2                        Powell                        104        10
   13.4                      Heiskell                        -            45
   15.6                 Chestnut Ridge                 -             -
   19.9                   East Siding                     116       160
   20.9                     Clinton                           -          yard
   24.6                      Laurel                           71          5
   33.6                      Poplar                           55          7
   35.6                  Oliver Springs                   -           15
   36.1               L. & N. Jct., Tenn.                -            -
   41.5                       Blair                            115         50
   46.0                   De Armond                       51         -
   50.5                     Harriman                         -           30
   51.5                 Harriman Jct.                       -         170

Layout Construction III - Backdrop & Valance

My backdrops are made using aluminum flashing. This is available in various widths in fifty foot rolls. That long enough to all around the train house with no joints. Here's the finished backdrop with the framing for the valance.

Backdrop and Valance Frame


Saturday, December 28, 2013

Givens & Druthers III - The Trains

The Southern Railway Carolina Division Employee Timetable #13, dated March 31, 1974 showed 18 trains on the S-Line. These included two passenger trains, which only ran on Sunday, Tuesday, and Friday, two rail-highway (piggy-back and autorack) trains, two unit coal trains, eight freight trains, and four local trains, of which only two ran on the modeled segment of the railroad. The passenger, rail-highway, and unit trains and one of the westbound freight trains were first class. All other eastbound trains were second class. Westbound trains were third class. Below are excerpts of the timetable schedule:



Sunday, June 23, 2013

Layout Construction II: Roadbed & Track

I used spline roadbed on my last layout and will continue it on this one. Here is a picture of the results, and then we'll get to the details.

Sunday, December 23, 2012

Givens & Druthers II - The Prototype

The Southern Railway's S-Line runs westward from Salisbury, NC, through Asheville to Bull's Gap, TN. Most of my early rail-fanning in North Carolina involved the section of this line between Hickory and Asheville. An article in the January 1981 Model Railroader about the Southern's Asheville Special made me think about including that on the layout. The Asheville Special stopped running in 1975. The locomotives that I was most familiar with on this line, EMD GP38-2s and SD40-2s, were purchased starting in 1972, so I decided on 1974 for the time period of the layout.

Monday, September 10, 2012

Layout Construction I: Shelf Benchwork

The Eastern S-Line layout will be multilevel with three levels of operating railroad and staging above and below the layout, all connected by helices. Like all multilevel layouts, there is a premium on having the decks as thin as possible so there is more room for sceniced, operating layout.

My first thought was to use 3/4 plywood as described in Tony Koester's book Designing and Building Multi-Deck Model Railroads. Thinking about this I realized that even though the layout structure is only 3/4 inch thick, there will still lots of "stuff" hanging down below the layout. This includes switch machines, wiring, signal and power distribution circuits, and lighting for the level below. Depending of the particular equipment used, this will generally be not more than about two inches thick.

If the stuff under the deck that we have to hide is two inches thick, we may as well used that for the layout structure as well. This will save vertical space by having the "stuff" and the structure use the same space. The design that I came up with is shown below, upside down on the workbench.


Bottom of Layout Shelf

Monday, September 3, 2012

Givens & Druthers I: Available Layout Space

The train house is a prefabricated 10x16 storage building in the back yard.

Train House
Train House

Friday, August 31, 2012

What am I doing?

This blog is to document the selection, design, construction and operation of my N scale model railroad layout based on the east end of Southern Railway's S-Line between Hickory and Salisbury, North Carolina.