My outbuilding in Laurinburg was a bit less that 150 square feet. The new trainroom is about 800 square feet. This will mean that I'll only have two levels instead of four or five. It also means that I can model more territory. Here is what I plan on modeling now.
Saturday, November 26, 2016
Monday, October 3, 2016
Moving! (This is not a sad story.)
Into the life of every layout there comes a time to move, or be chopped up. This time has come to my Southern S-Line, which wasn't even very far along yet.
Here are the pieces of the layout I had in the train shed, carefully removed by the truck driver and ready to load. Fortunately, I have a new job, a new house, and a new knee (well not new, just repaired). I did learn a lot building this part of the layout. I doubt any of these pieces will be used again, but the Southern's S-Line is not dead. It is coming back better than it would have been before.
Here are the pieces of the layout I had in the train shed, carefully removed by the truck driver and ready to load. Fortunately, I have a new job, a new house, and a new knee (well not new, just repaired). I did learn a lot building this part of the layout. I doubt any of these pieces will be used again, but the Southern's S-Line is not dead. It is coming back better than it would have been before.
Friday, January 1, 2016
Oyama Staging Yard III - Programming
Subscribe to:
Posts (Atom)